Vpacket 6100 SERIES Installation Guide Page 46

  • Download
  • Add to my manuals
  • Print
  • Page
    / 128
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 45
38 Acme Packet 6100 Hardware Installation and Maintenance Guide
3. For both holes in the flange, place one #10-32 x 5/8” screw through the
mounting spacer, then through the slide rail flange and into the tapped
hole.
Mounting Spacer
#10-32 x 5/8” Screw
Slide Rail Flange
Tapped-Hole Rack
Figure 4 - 46. Attaching the Slide Rail to a Tapped-Hole Rack
4. Using a #2 Phillips head screwdriver, tighten the screws to secure the slide
rail to the equipment rack. Do not completely torque the screws; leave a
small amount of play at this time.
Figure 4 - 47. Installed Slide Rail in a Tapped-Hole Rack - Front Mount Point
5. Expand and line up the unpainted side of the equipment rack slide rail on
the outside of the rear rack slide rail at the same height used for the front
mount point.
Figure 4 - 48. Aligning Rear Mount Points of the Slide Rail in a Tapped-Hole Rack
Page view 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 127 128

Comments to this Manuals

No comments